Projects

World-Class Projects Constructed for World-Class Clients

WGPITTS has completed projects for well-respected names in the industry such as: Taylor Woodrow Communities, the Ritz Carlton Company, Amelia Island, Plantation at Ponte Vedra, St. Joe Company, Centex Homes, Pulte Homes, Landmar, DR Horton, Walt Disney Company, Publix, Hines, Omni Hotels, Hyatt/Monarch Alternative Capital and numerous other service-oriented, quality-driven development companies.

Hospitality & Resort

WGPITTS has hospitality and resort construction in its DNA. In fact, the very first project of WGPITTS was the reconstruction of the stadium course and tennis complex at the Ritz Carlton, Amelia Island Florida. In those 17 years since then WGPITTS has been honored to work at some of the finest hospitality and resort properties. 

Saratoga Springs Resort & Spa, Walt Disney Resort Orlando, Florida

WGPITTS completed the architecture design services for a 1200 room total renovation of the Saratoga springs resort in 2018.

Exterior
Bathroom
Room Interior

Melia/Hyatt Regency. Grand Reserve, Rio Grande Puerto Rico

Following damage to the Melia resort WGPITTS assisted Monarch Capital in the acquisition and construction management of the $32 million renovation of the Melia Resort and conversion to the 700,000 sf 400 room Hyatt Regency Grand Reserve, Rio Grande Puerto Rico. The acquisition entailed a full engineering assessment of the facility including all structural damage, power distribution, water testing, mechanical, electrical, plumbing systems, kitchen equipment, mold studies, thermal and moisture Testing roofing assessments and the associated cost to complete and repair all components. Following the acquisition WGPITTS assisted the owner in managing the contractor CIC and other contractors in executing the work required for the successful  conversion of the property to a Hyatt Regency. Work included entire hotel renovations, M/E/P upgrade and site and utility upgrade with landscape and site improvements. Estimating and project management prior to the purchase of the Melia Coco Beach Hotel which was damaged by Hurricane Maria in 2017. The WGP staff represented a hedge fund that wanted to purchase the asset and we evaluated the damaged infrastructure at the former Hotel. After the $30,000,000 purchase, WGPITTS  oversaw the renovation by providing punch list management and quality control oversight to help bring the hotel up to the current building code. We established scopes of work and sought estimates for the client so that they could make educated decisions.

Hyatt-Regency-Grand-Reserve-Puerto-Rico
the-resort-at-coco-beach (6)
Picture2
Picture4
the-resort-at-coco-beach (2)
the-resort-at-coco-beach

Bakken Village, Watford City North Dakota

This 70,000 square feet 4-story development designed and constructed by WGPITTS provides retail, office, and housing for the burgeoning oil industry in North Dakota. The project first floor consist of retail/office constructed of structural concrete, structural steel and glass storefront. The upper three floors are extended stay hospitality constructed of wood frame with balconies on each room and Hardiboard exterior. Each residential unit contains a full kitchen and other amenities.

Bakken Side Elevation
DSCN0476
interior 2
DSCN0456
bakken sunset filtered
interior 1 filter
Filtered 1

Ronald McDonald House, Jacksonville, Florida

WGPITTS completed the design-build of the 70-room renovation, design and construction of new commercial kitchen, rooftop garden, children's playroom and boardroom improvements at the Ronald McDonald House of Jacksonville, Florida.

Photo Sep 22, 7 29 31 PM
Stair Magazine Photo
Boardroom 6.21.16 5
15540924_949612191806798_5807531904072499200_o
Sunny Rooftop 1
Guest-Room-768x576
Playroom Original

Steamboat City, Brunswick Georgia

Coordinated the completed rezoning, engineering, entitlement for a $100 million - 2000-acre, mixed use development project. Completed the full architectural design for the Steamboat City Theme Park. Coordinated a team of over 50 consultants and design professionals to take the project concept and program to full and complete set of architectural bid documents including graphics and ride and show design. Managed the construction of project infrastructure water and sewer, Completed the design development of 70-acre commercial village of 200,000 sf of commercial property, a 125-acre RV park and Campground and a regional destination entertainment park.

Logo - Steamboat Theme Park low res
1a. Steamboat Theme Park Master Plan
5. Steamboat Train Station2
6. Lighthouse at Seas Adventure
4. Main Street
Steamboat Farmers Market
Log Flume Ride
4a Coca Cola Corner
Steamboat County Fair
Steamboat Haunted Plantation2

Merchant's Walk Steamboat City, Brunswick Georgia

WGPITTS managed completed the design development of 70-acre commercial village of 200,000 sf of commercial property, a 125-acre RV park and Campground and a regional destination entertainment park.

STEAMBOAT-VILLAGE-MERCHANT'S WALK-LOGO
Steamboat Commercial
Steamboat Commercial Village
Commercial Village Big Box
Icon Study withTrain

Hurricane Florence Interior Renovations of Camp Devil Dog Barracks (Camp Lejeune Marine Base, NC)

WG Pitts Completed the Hurricane Florence repairs to the interiors of Camp Devil Dog Buildings, DD5, DD6, DD7, DD8, DD34, DD38 and DD39. Work to include was structural column demolition and installing metal stud framed walls, add wall and ceiling insulation, installing new gypsum wall and ceiling board, replacing wood base and crown moldings, remove old damaged exterior window caulking and re-caulking, remove and replace damaged metal exterior doors and hardware, remove and replace new lights and surface mounted ceiling conduits, install new HVAC grilles, interior painting. Test all electrical, fire alarm and telecom and make functional if not working.

 

Camp Devil Dog

Sports and Recreation

Sports and Recreation

  • Aquatic Facilities
  • Athletic Complexes   
  • Sports Fields
  • Stadiums
  • Themed Entertainment

WG Pitts has extensive experience in the construction of ball stadiums, fitness centers, playgrounds, tennis courts,

basketball courts, soccer fields, and other sports amenities that add unparalleled value to any facility. From the design

stage, where we provide opportunities for suggestions and ideas, through the construction process, WG Pitts works

with community developers to ensure the finest in recreation facilities.

119682234_scaled_909x690

Clubhouses & Amenity Centers

Planned communities that feature clubhouses, recreational facilities and amenity centers top the list for consumers. WGPITTS's extensive experience includes the planning, architecture, design and construction of clubhouses, recreation facilities and amenity centers. These facilities include: aquatic parks, ball stadiums, playgrounds, tennis courts, basketball courts, soccer fields, and other sports amenities that add unparalleled value to any facility or community.

Clubhouses - Amenity Centers -Community Centers - Aquatic Parks - Sports Complexes -Playgrounds - Aquatics - Athletic Courts - Entry Features - Hardscape

Fleming Island Plantation, Clay County, Florida

Design-Build for Centex Homes

WGPITTS provided design-build services for many of the amenities in this beautiful subdivision. This design-build participation included a world class tennis facility with a professional tennis stadium, as well as basketball and sand volleyball courts, playground pavilions, and a state-of-the art aquatic facility with an interactive spray ground for the children to enjoy.

Design-Build for Centex Homes
Fleming Island Plantation
Fleming Island Plantation
Fleming Island Plantation
Fleming Island Plantation
Fleming Island Plantation

Glen Kernan Golf & Country Club Amenity Center, Jacksonville, Florida

Constructed for Hodges Boulevard Development Group

WGPITTS constructed the stately Glen Kernan Sports Complex and Kernan Boulevard Entry. This project’s amenities include a 107,000 gallon six-lane 25 meter pool, eight competitive-level Fast Dry lighted tennis courts, volleyball, tot-lot, lighted regulation size basketball court, and multi- purpose flag football / soccer field. Additional features include covered seating and walking paths. The Project is situated in a beautiful heavily landscaped setting

 

 

WGPITTS constructed the stately Glen Kernan Sports Complex and Kernan Boulevard Entry
Glen Kernan
Glen Kernan Sports Complex and Kernan Boulevard Entry
aerial
Amenity Center Constructed for Hodges Boulevard Development Group
Glen Kernan Golf & Country Club Amenity Center, Jacksonville, Florida
Glen Kernan Golf & Country Club Amenity Center, Jacksonville, Florida

Heritage Landing, St. Johns, Florida

Constructed for DR Horton

WGPITTS constructed the “Camp Heritage”, the amenity facility at Heritage Landing, was constructed for D.R. Horton and reflects an old-style camp theme.  The world-class clubhouse features a fitness center, bathhouses, catering kitchen, bar and private meeting room.  Other resort-style amenities include a storytelling pavilion, horseshoe pits, courts for shuffleboard, bocce, tennis and basketball, baseball field with dugouts, and soccer field.  Families can enjoy a playground, stone sidewalks and a covered picnic pavilion.  A 27 - foot tall water slide that empties into a fun pool is he community’s showcase feature.  Completing the water elements is a heated Junior Olympic pool with decks and shade pavilion.

Heritage Landing Entrance Sign Constructed for DR Horton
Heritage Landing 7-22 003
amenity facility at Heritage Landing, was constructed for D.R. Horton
Aerial
Heritage Pool
amenity facility at Heritage Landing, was constructed for D.R. Horton
Fireplace

Hampton Park, Jacksonville, Florida

Constructed for Landmar Group

WGPITTS constructed the new amenities complex and entrance features for Hampton Park. Construction at the site included a sales office building, social facility, and maintenance building, as well as monument signage. Basketball and Tennis courts grace the complex, along with a swimming pool and fountain. Residents enjoy the security of a gated entrance.

 

Hampton Park, Jacksonville, Florida Constructed for Landmar Group
Hampton Park Fountain
clubhouse
HAMPARK3
Hampton Park Gatehouse
Hampton Park Amenity Center Basketball Court

Palm Coast Plantation Clubhouse, Palm Coast, Florida

Constructed for Waterway Properties 

The jewel of Palm Coast Plantation, constructed for Waterway Properties of North Carolina, is a $1.5 million main entrance featuring a spectacular waterfall and state-of-the-art, access-controlled guardhouse.  The magnificent 7,000 square foot lakeside community clubhouse includes a fitness center, billiards room, a beautiful swimming pool with a wading pool and spa, four tennis courts, and a wealth of other activities.

 

Palm Coast Plantation Entrance Sign
Palm Coast Plantation Clubhouse, Palm Coast, Florida
Plantation 2
Palm Coast Plantation Swimming Pool
131914608_scaled_705x583
Palm Coast Plantation Bridge Enhancement

St. Johns Forest, St. Augustine, Florida

Constructed for Taylor Woodrow Communities

Constructed for Taylor Woodrow Communities, the stunning French country clubhouse at St. Johns Forest holds a café, formal gathering room and solarium opening to a resort-style swimming pool with beach entry, fountains and a two-story tower slide. The recreation complex also contains tennis courts, full and half court basketball, roller hockey rink, tot lot and multi-purpose sporting field.

 

St Johns Forest Front Entrance
124557041_scaled_699x494
Clubhouses and Amenity Centers - Interior
St Johns Interior
Clubhouses and Amenity Centers - St Johns Forest Aerial
St Johns Forest Fitness Center
Treaty Oaks Entrance Sign

Design-Build for St. Joe Company

With Arvida / St. Joe, WGPITTS's Design/Build team constructed this beautiful low-country style clubhouse. A significant amenity to any community, the clubhouse provides a warm and friendly welcome to residents and guests.  Lush landscaping, magnificent views of the golf course and the peaceful waters of a large lake bordered by woods can be seen from the clubhouse.  Inside, wood floors and wood-beamed ceilings complement a beautiful, handcrafted wood and granite bar, and comfortable sofas and club chairs near a stone fireplace create a gathering place for friends and family.

St Johns Golf & Country Club constructed by WGPITTS General Contractor, Jacksonville Florida
Professional Services
St Johns Golf & Country Golf Pro Shop
St Johns Golf & Country Golf Dining Room
132011779_scaled_700x420
St Johns Golf & Country Club 9th hole constructed by WGPITTS General Contractor, Jacksonville Florida
St Johns Golf & Country Golf Commercial Kitchen

St. Johns Golf & Country Club, Amenity & Fitness Center, St. Augustine, Florida

Design-Build for St. Joe Company

ST Johns Golf Amenity
St Johns Golf & Country Club Fitness Center
St Johns Golf & Country Club Pool

Treaty Oaks, St. Augustine, Florida

Design-Build Constructed for Double Eagle Development, LLC

Treaty Oaks Entrance Sign
Treaty Front Elevation-v
Treaty 2016 aerial 3.1.16

WaterChase, Tampa, Florida

Constructed for Taylor Woodrow Communities

The exclusive clubhouse at Waterchase was built by WG Pitts on behalf of  Taylor Woodrow Communities. The breathtaking 6,400 square foot clubhouse is reminiscent of a French chateau or an English manor house influenced with a dash of the Caribbean to create a casual elegance.  Completing the clubhouse is a state-of-the-art fitness center and aerobics studio. Upon arrival, cascading waterfalls and exquisite landscaping adorn the entrance to Waterchase. Included in the infrastructure built by WGPITTS are the gatehouse and the grand Boulevard lined with charming European-style street lamps, bridges, fountains and hardscape.

 

WaterChase Entrance
Waterchase Aerial
Waterchase Playground
OLYMPUS DIGITAL CAMERA
Clubhouses and Amenity Centers
Clubhouses and Amenity Centers WC Interior
WaterChase Clubhouse Restroom

King & The Bear Amenity Center, World Golf Village, St. Augustine, Florida

Constructed for Davidson Development

King & Bear Logo
Screenshot 2022-11-15 145629
King & Bear Amenity Center
King & Bear Amenity Pool Aerial

North Hampton Amenity Center, Yulee, Florida

Constructed for Landmar Group

WGPITTS constructed the amenities complex and entrance improvements for the North Hampton community in Yulee, Florida. Also included were a sales office building, social facility, maintenance building and monument signage. Residents enjoy amenities which include basketball and tennis courts, swimming pool, fountain, and a gated entrance.

North Hampton Amenity Center, Yulee, Florida Constructed for Landmar Group
WGPITTS constructed the amenities complex and entrance improvements for the North Hampton community in Yulee, Florida.
North Hampton Amenity Center Flag
WGPITTS constructed the amenities complex
North Hampton
clubhouse
North Hampton Amenity Center Tennis

Summer Key, Jacksonville, Florida

Constructed for DR Horton

WGPITTS was the general contractor of the Summer Key Amenity Center. The Summer Key Amenity Center features a Key West theme and was constructed for D. R. Horton.  The clubhouse facility includes a main gathering area with a 52” plasma television and kitchen, a stereo system throughout, internet center, state-of-the-art fitness center, billiards/entertainment room, and a 2,800 square foot indoor basketball court.  Outdoor recreation amenities at Summer Key include an 87,000 gallon swimming pool, 10 person hot tub, children’s , playground and jogging trails.

Summer Key Clubhouse and Amenity Center Constructed by WGPITTS
general contractor of the Summer Key Amenity Center
Billiard - Summer Key Amenity Center
2,800 square foot indoor basketball court
Summer Key Amenity Center
Pool - Summer Key Amenity Center.
general contractor of the Summer Key Amenity Center

Three Rivers , Nassau County, Florida

Designed and Planned for Arendale Holdings

WGPITTS completed the design, master planning, and programming for the Three Rivers Community, Clubhouse and Amenity Center and Tennis Complex for Arendale Communities

Three Rivers Entry
Three Rivers Amenity Rear
126590628_scaled_700x394
three rivers site plan
Three Rivers Community, Clubhouse and Amenity Center and Tennis Complex for Arendale Communities
126590607_scaled_702x395
Roundabout at Three Rivers Boulevard

Yellow Bluff Landing, Jacksonville, Florida

Constructed for Young Land Group

Yellow Bluff  f/k/a Tisons Landing Amenity Center is a beautiful  facility constructed for the Young Land Group.  The clubhouse features a large wrap-around porch, perfect for relaxing and enjoying the scenic surroundings, a large gathering room, kitchen and computer room.  This project incorporates resort-style amenities including an outdoor fireplace, courts for basketball and tennis, and a soccer field.  Families will enjoy the large playground or strolling around the grounds on the long winding sidewalks leading to numerous shade pavilions.  In addition to a large swimming pool, children will enjoy a splash pool with a unique water spray feature.

Yellow Bluff Landing Entrance Sign
Yellow Bluff Landing Clubhouse Front
Yellow Bluff Landing Amenity Center Swimming Pool
Yellow Bluff Landing Outdoor Fireplace

Walden Chase St. Augustine, Florida

Constructed for Ray O' Steen

WGPITTS provided complete design-build services for the entry features, screen wall, and Amenity Center for the Walden Chase community. The Amenity Center includes tennis and basketball courts, a playground, swimming pools, and recreation/ restroom facilities

Walden Chase Entrace Sign
Walden Chase
Walden Chase
Walden Chase Swimming Pool
Amenity Center for the Walden Chase community
Amenity Center Constructed for Ray O' Steen
Walden Chase

Mira Vista, Jacksonville, Florida

Constructed for Centex Homes

Constructed for Centex Homes, this community’s soft Mediterranean charm is displayed in this graceful amenity center.  The facilities include the Mira Vista Clubhouse, fitness center, covered patio, catering kitchen, social room, a sparkling lakeside swimming pool, and community car wash island.

 

Mira Vista Tower Sign
Mira Vista Nighttime amenity center
Mira Vista Fountain - amenity center
Mira Vista Entrance
Mira Vista Sales Center Jacksonville, Florida
Mira Vista Aerial
amenity center Constructed for Centex Homes Mira Vista, Jacksonville, Florida

Gardens, Entrances & Gatehouses

Gardens

Ronald McDonald Rooftop Garden, Ronald McDonald House, Jacksonville, Florida

WGPITTS provided design-build construction of the state-of-the-art Ronald McDonald House Rooftop Garden.

RMH Rooftop
15493372_949612175140133_8118923557519321185_o
Sunny Rooftop 1
15540924_949612191806798_5807531904072499200_o

Village Green, Palencia, St. Johns County, Florida

WGPITTS Provided dsesign-build construction of the Palencia Village Green.

the-palencia-club-fountain
Palencia5287_LR
Palencia5295_LR
Palencia village green

Margarets Walk, Clay County, Florida

WGPITTS constructed the entrance feature and garden walk area at Margarets Walk

entry pano
00016G,F,P
MWENTR~1
00015G,F,P
Margaret's Walk
Margaret's Walk
Margaret's Walk

Entrances

JAMESIS1 Filtered
KONICA MINOLTA DIGITAL CAMERA
00039Gate
DSC_0027
Screenshot 2022-11-15 140439
North Hampton
img_Gran Park Sign
St Johns Forest Front Entrance filtered
Treaty Entry Sign Graphic
00036Gate
00044Gate
DSC_5295
JULINGT7
-12-576x400-0
entryway
Picture4
DSC_5893
Hampton Glen
Walden Chase
Kensington_Sign

Gate Houses

St. Johns Forest, St. Augustine, Florida

WGPITTS constructed the St. Johns Forest Gatehouse for Taylor Woodrow Communities

00030Gate

Windsor Ranch, St. Augustine, Florida

WGPITTS constructed the Windsor Ranch gatehouse and entrance for Lennar Homes

00042Gate

WaterChase, Hillsborough County, Florida

WGPITTS constructed the WaterChase gatehouse and entrance for Taylor Morrison fka Taylor Woodrow Communities

WC Gatehouse - 1

Palm Coast Plantation. Palm Coast, Florida

WGPITTS constructed the Palm Coast Plantation gatehouse and entrance for Waterway Properties.

Palm Coast Plantation Entrance Tower

Plantation Island, Julington Creek Plantation, St. Johns Florida

WGPITTS performed design-build of the plantation island gatehouse. 

00029Gate

James Island, Jacksonville, Florida

WGPITTS constructed the James Island gatehouse for the St. Joe Company. 

Picture2

Grand Haven, Palm Coast Plantation, Florida

WGPITTS constructed the Grand Haven entrance for Landmar Group

DSC_5883

Commercial Construction

WGPITTS' attention to detail has helped to establish our reputation as a superior commercial construction specialist.  The WG Pitts project management team has a wealth of experience in a variety of commercial and light industrial facilities such as office buildings, financial institutions, restaurants, breweries, retail centers, office parks and warehouse buildings.

Flame Tree Restaraunt Addition, Animal Kingdom Theme Park, Orlando, Florida

Constructed the new Flame Tree Pavilion and walkway addition in the Animal Kingdom Theme Park for Walt Disney Company

2018-06-24 15.07.24
2018-06-24 15.06.06
2018-06-24 15.07.56
2018-06-24 15.10.26

City and Police Federal Credit Union (Branch Location), Jacksonville, Florida

Branch Location

Design-Build

DSC_7603
DSC_8408

City and Police Federal Credit Union Corporate Office Sunbeam Road, Jacksonville, Florida

Corporate Office Location 

Design-Build

City & Police Credit Union Exterior
CU Lobby 2
DSC_0044 (1)
CU4 (1)

Hampton Professional Park, Jacksonville, Florida

55,000 SF Class A Office

Design-Build Construction for Hampton Professional Park, LLC

Second building cropped
DSC_2041
DSC_1051

Wicked Barley Brewery, Jacksonville, Florida

New Restaurant and Brewery

Constructed for Wicked Barley Brewery

Wicked Barley b1
Commercial Construction - Wicked Barley

Shoppes at Johns Creek, St. Johns County, Florida

`13,500 SF Retail Center 

Constructed for Regency Centers

Johns_Creek0003
IMG_8158
Commercial Construction - Shop at Johns Creek

Villages of 103rd, Jacksonville, Florida

`10,500 SF Retail Center 

photo 21

Cobblestone Professional Park , St. Augustine, FL

Coordinated the rezoning, engineering, entitlement for a 50,000 sf professional class "A"office park. Coordinated the design and construction of all project infrastructure and buildings Includes interior design, Information technology and interior build out. Project will include 5 buildings, site work interior buildout and furnishings on models for the developer.

Cobblestone Elev(pantene)

Palencia Golf Maintenance Facility, St. John's County, Florida

10,500 SF Golf Maintenance Facility with fuel 

Constructed for Hines

DSC_0271

St. Johns Golf & Country Club, Golf Maintenance Facility, St. John's County, Florida

10,500 SF Golf Maintenance Facility with fuel 

Constructed for St. Joe Company

Commercial Construction

Government

WGPITTS is a reliable source for government agencies for all of our facility solutions and as a government sales provider.

In the government sector, WGPITTS has performed for: FEMAGovernment of Puerto RicoPuerto Rico Infrastructure Finance Authority (PRIFA)NAVFAC, U.S. Veterans Administrations, U.S. Department of Interior, U.S. Fish & Wildlife Services, NAVSUP Fleet Logistics Center, U.S. Navy, Mission Contracting Command - U. S. Army, General Services Administration, Federal Bureau of Prisons, U.S. Army Depot and other federal agencies.

WGPITTS has also worked as a TIER1 Contractor under numerous large defense and disaster recovery contractors including DynCorp International, KBR and Environmental Chemical Corporation (ECC) and Excel USA and Allco, LLC.

These superb groups and the individuals representing their companies or agencies share many of the same the values and commitment as the WGPITTS. Our clients and employees helped established the foundation of our method of conducting business and will help shape the future of the company.

  • Barracks
  • Criminal Justice
  • Expeditionary Camps
  • Physical Security
  • IT Infrastructure
  • Bridges
  • Disaster Recovery
Untitled design

Structural Column Repair of 7 Schools Following 2020 Eartquakes in Puerto Rico

WGPITTS completed the design-build of structural column repairs in excess of 1500 columns at 7 locations throughout southeast Puerto Rico.

Picture3
workers on scaffold

Design Build of the Alligator FARP and Hicks Run Bridge, Camp Lejeune Marine Base, North Carolina

WGPITTS completed the design, engineering and construction of two vehicular bridges. Project entailed detailed site and field assessments, environmental engineering and dive surveys of the existing conditions, engineering of  the new bridge structures, and construction of the two bridges. The scope of services is encompassed all engineering and construction tasks required to obtain approval for the Hicks Run Road bridge design,  provide construction engineering for the Alligator FARP Bridge and outline construction installation concept of operations.

Picture11
Picture9

Department of State, Grand Ravine Police Station, Port au Prince, Haiti

  • Construction Manager for an $18 million police headquarters, barracks for housing officers and administrative offices for the US Department of State, INL, under a prime contract with Dyncorp International
  • Conducted a stage I assessment and presented and engineering and construction management plan to redesign the facility to meet ibc structural codes
  • Performed the construction activities to upgrade the facility to meet IBC standards
  • During Stage II, Performed as the Owner's representative to complete the design and engineering documents and manage the subcontractor(s) to complete the upgrades

 

00003Gov
00001Gov

Repair, Reconstruction or Relocation Program "R3", Puerto Rico

WGPITTS is currently executing the R3 program in the southern part of the Island of Puerto Rico. The focus of the R3 Program is to provide relief for those who were impacted by Hurricanes Irma and Maria while addressing recognized impediments to affirmatively furthering fair housing as required under the Fair Housing Act. Assistance under this Program will be provided under three primary avenues: repair, reconstruction, and relocation (R3). Within the reconstruction or relocation venues, demolition of substantially damaged dwellings is an eligible activity.

Under the R3 Program all repair, reconstruction and new construction activities will be designed to incorporate principles of sustainability, including water conservation, energy efficiency, resilience, and mitigation against impacts from future disasters. The Selected Proposers will implement design and construction methods that emphasized quality, durability, energy efficiency, sustainability, and mold resistance.

Picture8
Picture7

Building H-1 Interior Renovations, Camp Lejeune Marine Base, North Carolina

WGPITTS Completed the renovation of the Marine Corp Headquarters building at Camp Lejeune Marine Base, NC. The project entailed the repairing of areas demolished during dry-out activities related to the Hurricane Florence emergency response. Building H-1 is a three story 376,988 sf facility constructed in 1942. The work entailed a complete gutting and new interiors of the building. The project was completed for the prime contractor Environmental Chemical Corporation and CM for NAVFAC.

Screenshot 2022-11-15 095949

Interior Renovations of Camp Devil Dog Barracks, Camp Lejeune Marine Base, North Carolina

WG Pitts Completed the repair of the interiors on 9 buildings used as recruit barracks. Renovation included all wall and ceiling insulation, drywall. Lighting, interior lighting, interior trim, exterior doors and windows, hardware and paint.

Screenshot 2022-11-15 095812

US Army - Tobyhanna Amy Depot Kitchen Renovation 2014, Tobyhanna, Pennsylvania

Renovation and New Equipment Installation

  • W25G1V-13-C-0019
  • 6,406 sf, 5,000 person facility
  • Replacement of all walk in freezers, electrical panels, fire protection, water mains, and HVAC systems
tobyhanna aerial
Tobyhanna Kitchen Andrea

Sheltering and Temporary Essential Power (STEP) Program, Puerto Rico

WG Pitts Completed the repair of the interiors on 9 buildings used as recruit barracks. Renovation included all wall and ceiling insulation, drywall. Lighting, interior lighting, interior trim, exterior doors and windows, hardware and paint.

Disaster recovery funded projects (CDBG-DR, FEMA, STEP)

Coordinating with other contractors performing different aspects of the federally funded programs - such as program managers, cost estimators and environmental consultants

90 homes/tickets completed in the STEP program with EXCEL (Mayaguez, PR)

Department of Veterans Affairs, Orlando VAMC Furniture Install 2015, Lake Nona, Orlando, Florida

VA248-15-J-1788

700,000 sf

Labor, Material, and Equipment to supervise and manage installation of office furniture and fixtures

In support of the Lake Nona VAMC Initial Outfitting, Transition and Activation (IOT&A), Clinic a and B (two 4 story wings) and the hospital's 4th floor

Management team coordinated with VAMC staff including IOT Director, CO, COR, VAMC Interior designer, and selected end users

Inventory control

Maintained specifications

Scheduled and coordinated Logistics

Provided on-site supervision of movers

Provided moving supplies

Provided Roll-off dumpsters

Provided all vehicles and containers used to transport waste or recyclables on or off the VA grounds, which met Federal and State DOT requirements

 

Department of Veterans Affairs ,VAMC Roof Replacement 2015-2016, St. Petersburg, Florida

Safety inspections

Review the construction contractor's safety program

identify worksite risk/coordinate risk reduction activities

collects deficiency information and disseminates summaries of actions and results

Department of Veterans Affairs, BPA for National IOT&A Services 2015-2020, Denver, Colorado

  • Contractor Teaming Arrangement (CTA) with Martek Global and Venturi, Inc.
  • comprehensive project management
  • comprehensive space planning services
  • comprehensive equipment planning
  • FF&E/supply Purchasing
  • Transition planning and relocation services
  • logistics/warehousing management services
  • warehouse rental
  • installation, testing, and training services
  • final turnover, closeout & post occupancy elevation services

Ft Benning Jump Tower Inspections - Ft Benning, Georgia

Provided management of engineering team performing engineering studies and structural inspections services of the jump towers for airborne training school at Ft. Benning Army

00004Gov

Alta Land and Environmental Survey, Eau Claire Courthouse, Washington

Provided Site and Environmental Engineering Service For US Department of Interior in North Bonneville, Skamania County, WA

Upgrade Physical Security, Phase 2 - VA Hospital. Gainesville, Florida

A/E Construction Management for new physical security upgrade

Life Safety Code Feasibility Study - VA Hospital - Gainesville, Fl

Statement of conditions for JCAHO requirements for compliance with latest edition of Life safety Code. Provide all labor and material to forecast all current and life safety needs for 1-5 to 10 year period to be used in planning and development of master plan after competition of new medical tower.

Life Safety Code Feasibility Study - VA Hospital - Lake City, Florida

A/E Design Services - Project Management Statement of conditions for JCAHO requirements for compliance with latest edition of Life safety Code. Provide all labor and material to forecast all current and life safety needs for 1-5 to 10 year period to be used in planning and development of master plan after competition of new medical tower.

Veterans Administration - Lake Nona, Florida

Labor, Material, and Equipment to supervise and manage installation of office furniture and fixtures

Tampa VAMC Furniture Install 2013, Veterans Administration - Lake Nona, Florida

Provided "turn-key" operation for 11 vendors and more than 100 CLINs of Materials

Site evaluation

Product Handling from shipper to site

Climate-controlled storage

Transportation including vehicles, insurance, drivers, supervisor, maintenance equipment, operation/tools/supplies

certified furniture installers

Unpacking, acceptance, inspection for damage

Assembly and installation in accordance with manufacturer's warranty specifications and VA-provided drawings

Debris removal and regular cleaning

Punch list and training for new years

Disaster Recovery

Structural Column Repair of 7 Schools Following 2020 Eartquakes in Puerto Rico

WGPITTS completed the design-build of structural column repairs in excess of 1500 columns at 7 locations throughout southeast Puerto Rico.

FEMA Approves Over $142 Million for Schools Affected by Earthquakes

workers on scaffold cropped2
Picture3

Design Build of the Alligator FARP and Hicks Run Bridge (Camp Lejeune Marine Base, NC)

WGPITTS completed the design, engineering, and construction of two vehicular bridges which were destroyed by Hurricane Francis. Project entailed detailed site and field assessments, environmental engineering and dive surveys of the existing conditions, engineering of the new bridge structures, and construction of the two bridges. The scope of services is encompassed all engineering and construction tasks required to obtain approval for the Hicks Run Road bridge design, provide construction engineering for the Alligator FARP Bridge and outline construction installation concept of operations.

Picture9
Picture13
Picture10
bcf15953-fae4-4049-9bea-5d8da840aad1
CLNC Bridge2

Hurricane Florence Interior Renovations of Camp Devil Dog Barracks (Camp Lejeune Marine Base, NC)

Following damage caused by Hurricane Maria, WGPITTS participated in the STEP Program providing emergency repairs to homes damaged by Hurricane Maria on the southern part of the island. WGPCAR opened its office in Ponce, PR and began working repairing homes under a contract with Excel Constructors out of Baton Rouge, LA. WGPCAR hired as direct employees manpower to complete the repair of 91 homes and additionally completed the warranty work for Excel relating to other contractors which left the island unwilling to complete the required warranty for the contracts. WGPCAR completed the work and received a very high recommendation from Excel and the Government of Puerto Rico GoPR. Disaster recovery funded projects (CDBG-DR, FEMA, STEP)

Screenshot 2022-11-15 095812

Sheltering and Temporary Essential Power (STEP) Program (Puerto Rico)

WG Pitts Completed the Hurricane Florence repairs to the interiors of Camp Devil Dog Buildings, DD5, DD6, DD7, DD8, DD34, DD38 and DD39. Work to include was structural column demolition and installing metal stud framed walls, add wall and ceiling insulation, installing new gypsum wall and ceiling board, replacing wood base and crown moldings, remove old damaged exterior window caulking and re-caulking, remove and replace damaged metal exterior doors and hardware, remove and replace new lights and surface mounted ceiling conduits, install new HVAC grilles, interior painting. Test all electrical, fire alarm and telecom and make functional if not working.

CDBG Repair, Reconstruction or Relocation Program "R3" (Puerto Rico)

WGPITTS is currently executing the R3 program in the southern part of the Island of Puerto Rico. The focus of the R3 Program is to provide relief for those who were impacted by Hurricanes Irma and Maria while addressing recognized impediments to affirmatively furthering fair housing as required under the Fair Housing Act. Assistance under this Program will be provided under three primary avenues: repair, reconstruction, and relocation (R3). Within the reconstruction or relocation venues, demolition of substantially damaged dwellings is an eligible activity.

 

Under the R3 Program all repair, reconstruction and new construction activities will be designed to incorporate principles of sustainability, including water conservation, energy efficiency, resilience, and mitigation against impacts from future disasters. The Selected Proposers will implement design and construction methods that emphasized quality, durability, energy efficiency, sustainability, and mold resistance.

 

The R3 program provides funding to repair damaged homes or rebuild substantially damaged homes in-place or at a new lot, in non-hazard areas and in compliance with applicable construction codes and standards. The repair and reconstruction venues return otherwise displaced families to their homes at their same community. Homes become eligible for reconstruction or relocation when (a) the property estimated cost of repair exceeds the lesser of $60,000 or 50% of the home's current value - as confirmed through program inspection, (b) the property is determined to be substantially damaged by an authority having jurisdiction, or (c) if a feasibility inspection determines that reconstruction is required. Homes meeting these criteria will be reconstructed and will include resilient measures in structural materials. Homes that may not be rebuilt in place due to legal, engineering, or environmental constraints (permitting, extraordinary site conditions, etc.) may be built in a new vacant lot or the homeowner may purchase an existing home at fair market price under the relocation venue. Construction of replacement homes will meet the construction standards in the latest approved Puerto Rico Building Code and must incorporate Green Building features. Homes with existing damage equal to or less than $60,000 of 50% of the current home's value, whichever is lesser, will be repaired in compliance with the applicable building codes and standards, including the International Existing Building Code and HUD CPD Green Building Retrofit checklist.

Picture7
Picture8

Hanger Repair Tyndal AFB

Following damage caused by Hurricane Maria, WGPITTS participated in the STEP Program providing emergency repairs to homes damaged by Hurricane Maria on the southern part of the island. WGPCAR opened its office in Ponce, PR and began working repairing homes under a contract with Excel Constructors out of Baton Rouge, LA. WGPCAR hired as direct employees manpower to complete the repair of 91 homes and additionally completed the warranty work for Excel relating to other contractors which left the island unwilling to complete the required warranty for the contracts. WGPCAR completed the work and received a very high recommendation from Excel and the Government of Puerto Rico GoPR. Disaster recovery funded projects (CDBG-DR, FEMA, STEP)

Hurricane Florence Interior Renovations of Marine Corp Headquarters Building (Camp Lejeune Marine Base, NC)

Due to storm damage caused by Hurricane Francis, WGPITTS Completed the interior demolition and renovation of the Marine Corp Headquarters buildings at Camp Lejeune Marine Base, NC. The project entailed the repairing of areas demolished during dry-out activities related to the Hurricane Florence emergency response. Building H-1 is a three story 376,988 sf facility constructed in 1942. The work entailed hazmat, asbestos abatement, demo to include non-structural walls, drywall framing systems, ceiling framing systems to include vents and tile, floor tile/carpet, lights, electrical sockets and wiring, all conduits to include electrical, communications and HVAC, plumbing (not sub-floor), alarm systems, HVAC systems, sprinkler systems, internal doors and mechanical room content. The project was completed for the prime contractor Environmental Chemical Corporation and CM for NAVFAC.

 

 

Screenshot 2022-11-15 095949

Melia/Hyatt Regency. Grand Reserve, Rio Grande Puerto Rico

Hurricane Damage Assessment and Acquisition

 

Following damage to the Melia resort WGPITTS assisted Monarch Capital in the acquisition and construction management of the Melia Resort and conversion to the Hyatt Regency Grand Reserve, Rio Grande Puerto Rico. The acquisition entailed a full engineering assessment of the facility including all structural damage, power distribution, water testing, mechanical, electrical, plumbing systems, kitchen equipment, mold studies, thermal and moisture Testing roofing assessments and the associated cost to complete and repair all components. Following the acquisition WGPITTS assisted the owner in managing the contractor CIC and other contractors in executing the work required for the successful  conversion of the property to a Hyatt Regency. Estimating and project management prior to the purchase of the Melia Coco Beach Hotel which was damaged by Hurricane Maria in 2017. The WGP staff represented a hedge fund that wanted to purchase the asset and we evaluated the damaged infrastructure at the former Hotel. After the $30,000,000 purchase, we oversaw the renovation by providing punch list management and quality control oversight to help bring the hotel up to the current building code. We established scopes of work and sought estimates for the client so that they could make educated decisions.

CM Photo

Infrastructure, Marine, Bridge Construction & Enhancements

WGPITTS has experience in Marine Construction represented by the following notable projects:

 

Palencia Nine Hole Clubhouse Retaining Wall., St. Augustine, Florida

WGPITTS completed the design build construction of the 50' x 600' Bulhead retaining wall separating the Palencia village green and the onsite retention pond of the 9th hole in the Palencia community in St. Augustine Florida.

rear view

Hicks Run and Alligator FARP Bridges, Camp Lejeune North Carolina

WGPITTS completed the design, engineering, and construction of two vehicular bridges which were destroyed by Hurricane Francis.

WGPITTS completed the Design-Build construction of the Alligator FARP bridge and the Hicks Run Road vehicular bridge at Camp Lejeune, North Carolina

Project entailed detailed site and field assessments, environmental engineering and dive surveys of the existing conditions, engineering of the new bridge structures, and construction of the two bridges. The scope of services is encompassed all engineering and construction tasks required to obtain approval for the Hicks Run Road bridge design, provide construction engineering for the Alligator FARP Bridge and outline construction installation concept of operations.

7d3cd87a-96c0-487c-9103-3814c2346d94
bcf15953-fae4-4049-9bea-5d8da840aad1
Alligator FARP
88fefbb8-c312-48df-85a2-bcb7f1f82f9b

Treaty Oaks Infrastructure, St. Augustine, Florida

WGPITTS completed the construction management of the earthwork, water sewer, power distribution and preparation of 420 residential lots in the Treaty Oaks Community.

Treaty Master Plan
treaty infrastructure
124545165_scaled_453x340

Brinkoff Road Infrastructure, St. Augustine, Florida

WGPITTS completed the engineering and construction management of the 1-mile-long county collector road. Design and constructed to the St. Johns County Standards in St. Johns County

Screenshot 2022-11-15 090007

Bridge Enhancements, WaterChase Hillsborough County, Florida

WGPITTS completed the construction management of the bridge enhancements of the vehicular bridge into the WaterChasse Community for Taylor Woodrow Communities in Hillsborough County, Florida.

131916338_scaled_714x439

Bridge Enhancements, Margarets Walk, Clay County Florida

WGPITTS completed the construction of the bridge enhancement to the vehicular bridge at Margaret's Walk for Montgomery Land Company

Margaret's Walk

Bridge Enhancements, Palm Coast Plantation, Palm Coast Florida

WGPITTS completed the construction of the bridge enhancement to the vehicular bridge at Palm Coast Plantation 

125039674_scaled_700x525

Bridge Enhancements, Deerwood Park Boulevard, Jacksonville, Florida

WGPITTS completed the bridge enhancement to the vehicular bridge at Deerwood Park for Gate Lands Company. 

Residential, Condominium, & Multi-Family

WGPITTS provides construction services for single family residences, multi-family and condominium projects.

Oceano Beachfront Condominiums, Palmas del Mar, Puerto Rico

WGPITTS is providing construction services for the Oceano Beachfront Condominiums in Palmas del Mar Puerto Rico.

Oceano Master Plan
general contractors - Oceano Front Puerto Rico
Oceano South Elevation

Oceano Town Homes, Palmas del Mar, Puerto Rico

WGPITTS is providing construction services for the Oceano, Palmas del Mar Puerto Rico new oceanfront community.

Townhomes
Townhomes floor plan

Residences of Bishopgate, Riverside, Jacksonville, Florida

WGPITTS performed the project planning design and rezoning for a 17-story 80-unit luxury condominium tower to be constructed in Riverside, Jacksonville, Florida.

Bishopsgate Renderings
Screenshot 2022-11-04 075026

Residences of World Golf Village, St. Augustine, Florida

WGPITTS constructed the second phase project of the Residences at World Golf Village Luxury Condominiums.

Residential Condominium Multi-Family
Residential Condominium Multi-Family
Residential Condominium Multi-Family

Single Family Residences, Oyster Bay, Yulee, Florida

WGPITTS completes design-build of single-family homes.

Residential Condominium Multi-Family
Residential Condominium Multi-Family
DSC_0145
DSC_0156
DSC_0136